New project “Technopolis of Modular house-building”
29 / 07 / 2020

On July 19, the building of the headquarters for the construction of the first complex of innovative technologies of “MonArch” Group of Companies was installed. The company is implementing its new project “Technopolis of Modular House-building” on the territory of the Troitsky and Novomoskovsky administrative areas in Marushkinskoye settlement. A modern line of robotic production of large-sized modules for the construction of buildings for various purposes will be built between Borovskoye Shosse and Privolnaya street.
The future complex for the production of modules will allow for a full cycle: from the production of a prefabricated monolithic frame to the complete finishing of the module, including the arrangement of facades and windows, with internal engineering. 

Our products are based on the patented technology and advanced developments of engineering bureaus in Germany, China, Italy, Malaysia and a number of other foreign countries. Our main partner in this project, EBAWE Anlagentechnik GmbH, is a company that implements our production lines in Marushkino on a turnkey basis. They include 5 robotic conveyors with a self-propelled gantry system. High-tech equipment for the production of modules is operated in a confined space and in absolute cleanliness. The operation of the entire complex is served by powerful air filters that purify the air not only at the inlet, but also at the outlet.

The estimated speed of erection of buildings made of large-size modules is 3 story-sections per day (20 modules). The builders erected a full-valued two-story building with interior and exterior decoration in Marushkino in less than 5 hours.
 

More details about the project can be found at the link:  Technopolis

2024 © ООО «Комбинат Инновационных Технологий - МонАрх»
Сделано в
logo